In October of 2012, Tesuco were contacted by Mr. Andrew Barnes
from Supagas, the gas supplier to the Devonport RSL Club. We
were asked to assist with an ongoing issue that the club was having
with their CO2 draught beer system.
THE PROBLEM
Over a 2 year period the draught beer gas distribution system
had been replaced on 3 separate occasions due to the failure of the
regulator valve seats. This failure caused the pressure
relief valves to vent, resulting in heavy losses of CO2
and forced the management to close down their draught beer dispense
system until the equipment was either repaired or replaced.
THE SOLUTION
The original manufacturer's beer gas distribution board was
removed in October of 2012 and replaced with a Tesuco system.
The Tesuco CO2 gas board has been developed using
extensive research, development and innovative components with
special internal materials to ensure that it will continue to work
under all conditions.
THE OUTCOME
We recently contacted the club's manager, Mr. Michael Stork and
asked if they have had any issues since performing the remedial
works and installing the Tesuco system. Michael confirmed
that there have been no further problems; the gas system is working
perfectly with no loss of gas. Devonport RSL patrons have
been able to enjoy their favourite draught beer without disruption
caused by the failure of the gas distribution system.
Bill Cadd